Design of the internal gas supply system is carried out in accordance with DNaOP 0.00-1.20-98 "Gas Supply System Safety Rules of Ukraine," "Rules for the Supply and Use of Natural Gas in the National State of Ukraine," DBN B.2.5-41:2009 "Gas Pipelines with Polyethylene Pipes," as well as the equipment manufacturer's technology, taking into account the customer's requirements, as specified in the design specifications. The internal gas supply system design includes:
The internal gas supply system design is usually completed in conjunction with the boiler house design, heating system design, water supply and sewerage design. During the design process for internal utility systems, specialists from the water supply and sewerage, heating and ventilation, electrical power supply, and low-current networks departments approve the intersections and submit the final versions of their sections to the construction and installation companies.
Required technical data for designing internal gas supply systems:
Design of external gas supply
Design of external gas supply utility networks during the construction of a new residential building (house), industrial facility, or administrative building is usually completed in conjunction with a boiler room design, heating system design, water supply and sewerage design, and heating network design. To connect to the gas supply network, it is necessary to obtain technical specifications from the gas supply company. We offer a turnkey technical specifications service. The cost varies for each project. For example, obtaining technical specifications for a private home up to 200 sq. m. costs UAH 11,500.00 (excluding official fees for issuing technical specifications). For other gas supply facilities, the price is calculated individually. You can obtain technical specifications yourself if you have the documents shown. Below.
Documents required for obtaining technical specifications:
After receiving the technical specifications, we can calculate the cost of the design work, taking into account topographic, geodetic, and geological surveys, as well as approval from all relevant authorities. The design for connection to the gas supply network is developed based on DBN B.2.5-20-2001 "Gas Supply," DNAOP 0.00-1.20-98 "Gas Supply System Safety Rules of Ukraine," and DSTU B. V.2.5-29:2006 “Gas supply system. Underground steel gas pipelines. Gas protection against corrosion", "Rules for the supply and recovery of natural gas in the people's dominion of Ukraine", DBN. V.2.5-41:2009 “Gas pipelines from polyethylene pipes.”
Have questions - call
+38 098 501 14 14.